From staff reports
City of Franklin contractor Suit-Kote is applying crack seal treatment to roads in the Franklin Heights area starting today.
Work will be completed on Wendy Way; Forest Lane to the water tank end; Evergreen Drive from 15th Street to Edgewood Drive; and South Edgewood Drive from Evergreen Drive to Evergreen Arbors.
There will be traffic delays and possible road detours in the affected areas.
The slurry seal will only be applied to half the road at a time, so roads will not be completely shut down. Vehicular traffic will not be allowed on the slurry seal until it dries.